corrosion protection and leakage control
...........................
PLCS Ltd Project Profiles:
Client: BG Transco, North West LDZ, UK
Description:
4'' off 8'' under pressure tee with damper plate low pressure gas escape.
Repair method:
Design, supply and install special encapsulation gas repair kit to BGC/PS/LC8 part 1.
Client: Rugby Cement Company Limited
Description:
Protection of welded field joints during and on completion of pipe insertion during directional drilling operation.
Repair method: Supply and installation of Covalence HTLP60 three layer corrosion protection heat shrink sleeves.
Client: BG Transco, West Midlands LDZ, UK
Description:
Gas escapes on 24'' .n.b. donkin valve flanged joint semi medium pressure 5 psi.
Repair method:
Design, supply and install special encapsulation gas repair kit to BGC/PS/LC8 part 1.
Client: BG Transco, West Midlands LDZ, UK
Description:
Gas escape on drilling equipment connected to 36'' cats iron medium pressure gas main 15 psi.
Repair method:
Design, supply and install special encapsulation gas repair kit to BGC/PS/LC8 part 1.
Client: BG Transco, West Midlands LDZ, UK
Description:
Preventative leakage maintenance to 24'' lead yarn low pressure cast iron gas joints due to road modernisation scheme in city centre location.
Repair method:
Design, supply and install special encapsulation gas repair kit to BGC/PS/LC8 part 1.
CovalenceLogo
Tel: (44) 01384 298000